smart Construction laboratory Ltd.

智能建造實驗室有限公司

4S Labelled Project of

Building Construction

Construction of District Health Centre cum Social Welfare Facilities at Siu Sai Wan (NSC)

Contract No. SS J509, Construction of District Health Centre cum Social Welfare Facilities at Siu Sai Wan (NSC)

Year: 2021-2024
Header image

Reserved a site of about 1,781 square metres next to the Siu Sai Wan Complex, the Siu Sai Wan Health Centre project  will provide seven medical and social welfare services. The objective of this project is to simplify the operator's management process and avoid potential safety incidents by real-time monitoring workers' location and health status, as well as digitalising information on the use and maintenance of mobile equipment (such as cranes).

Testimonial logo
Introduction
Smart Construction Solutions

Customised 4S Solutions

In a largescale construction project, the management of personnel and mobile machinery are the two major factors affecting the quality and efficiency of the project.
In this project, Unsafe behaviour hazard alert in mobile plant operation area, Digitized tracking system, Digitized Permit-To-Work, Smart monitoring devices for workers and frontline site personal and Safety monitoring system using artificial intelligence were integrate into the Central management platform, protecting workers' safety and monitor project progress in real time.
Mockup

Central management platform

A one-stop hub for data analysis and alerts generation, as well as facilitating follow-up action swith potential hazards and abnormalities identified.
Mockup

Digitized tracking system

A digitalized system for real-time on-line tracking of all site plants, powered tools and ladders up-to-date status with respect to record of testcertification, examination, checking and maintenance by mobile device.
Mockup

Digitized Permit-To-Work

• Easy to use template forms; Templates are customizable.
• Pre-defined workflow with highly customizable abilities
• Dashboard listing permits status, permits type and recent requests.
Mockup

Unsafe behaviour hazard alert in mobile plant operation area

• Preciseactive dectection & warning powered by AI technology.
• Dimage display at day and night to capture pedestrian and vehicle.
• Danger zone configurable, set the suitable blind spot warning zone for your vehicle toimprove the safety.
• Automatically switch to full screen rear view when reversing & equipped with external flashing warning for pedestrian.
Mockup

Smart monitoring devices for workers and frontline site personal

Smart Watch: Simultaneously integrates GPS, RTK; supports monitoring heart rate and body temperature. The standby time is 21days (static positioning).
Geofencing: Supports geofencing, triggers analarm when approaching the boundary.
Accuracy: 15m.
Mockup

Safety monitoring system using artificial intelligence

• Identify unsafe behaviors and recorded in CMP automatically.

Alert list show live alerts information with SMS message notifications.

Project Outcome

1. The CMP centralises the processing of all types of permit applications, optimising the management process and ultimately improving construction efficiency.

2. The Digitized tracking system listed assets stats and pending tasks with calendar. In this smart site project, the adoption of this module has improved management efficiency by 50 %.

4. The Unsafe behaviour hazard alert in mobile plant operation area module has the potential to decrease hazard rates by 30% and increase the occupational health of construction operators by 40%.

5. The Digitized Permit-To-Work & Smart monitoring devices for workers and frontline site personal module efficiently manage the daily operations of over 200 workers and their access to the site.

6. The AI Camera not only monitors PPE, but also unsafe behaviours such as smoking.
Integration iconIntegration iconIntegration icon
Smart Construction Solutions

Technical Innovations

Everything you need to know about this 4S Labelling Project.
Why do I choose the Central management platform developed by SCLab?
The main advantages of CMP from SCLab:
• Tracking personnel numbers in real-time.
• Monitoring personnel locations in real-time.
• Understanding project progress in real-time.
If there is a network problem, will the 4S AI Camera still work properly?
Yes, we have adjusted the quality of the camera to 720p to meet the needs of the screen and the network.
Can I use the Digitized Permit-To-Work module by the mobile phone?
Yes. Android APP is provided; In-app notification and Push Message (google and Hua Wei) are supported.
What information can I get from the Digitized tracking system?
• Different kinds of tasks including inspection, maintenance, repaire and certificate.
• Search and view all the assets inthe system.
• Assets details withinspection/maintenance/repair/ certificate records.

Start your own project

Can’t find the answer you’re looking for? Please chat to our friendly team.